Lamar Area Street Maintenance
CobbFendley is the lead design firm for the preparation of plans, specifications and estimates for approximately 6,800 linear feet of roadway improvements in New Braunfels, Texas.
CobbFendley is the lead design firm for the preparation of plans, specifications and estimates for approximately 6,800 linear feet of roadway improvements in New Braunfels, Texas.
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles).
CobbFendley is providing engineering design services to the North Texas Municipal Water District (NTMWD) for the construction of a 10 MGD lift station and 15,000 linear feet of 24-inch force main.
CobbFendley designed a new 1.25M-gallon elevated water tank for the City of Sachse.
CobbFendley was responsible for design services and construction administration of the Main Street WWTP Improvements in Seabrook, Texas.
CobbFendley was responsible for the pipe bursting approximately 7,000 linear feet of 12” sanitary sewer gravity main along Todville Road from East Meyer Avenue to Brummerhop Street.
CobbFendley served as lead design engineer for this intersection improvements project providing roadway design, signing and pavement marking, traffic control, and bid and construction phase services.
CobbFendley is the lead design firm for the planning, surveying, design and construction of approximately 17,500 linear feet of 6-foot wide sidewalks in downtown New Braunfels.
CobbFendley has worked with the City of Grand Prairie for over eight years on drainage, erosion control, and bridge rehabilitation projects.
CobbFendley is currently under contract with the City of Fort Worth to develop access management concepts along University Drive from Chisholm Trail Parkway to Clear Fork Trinity River Bridge.