FM 1516 Roadway Reconstruction
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles).
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles).
CobbFendley performed engineering services for this transportation project, which included design of the final segment of the six-lane Legacy Drive arterial corridor in Frisco, Texas.
This CobbFendley project in Harris County involved widening the Bayou bottom width has been “in the books” for many years pending funding until 2017 when Congress signed a Bi-Partisan Bill in response to Disaster Recovery Relief for Hurricane Harvey.
CobbFendley is providing preliminary engineering services for developing a design schematic of this multilevel interchange project.
CobbFendley is responsible for the preparation of schematic, alignment alternatives, and environmental assessment documents for seven miles of US 281 from FM 490 to SH 186/FM 1017 in Hidalgo County, Texas.
CobbFendley performed preliminary engineering and prepared Plans, Specifications & Estimates (PS&E) for Fondren Road from US 59 northbound frontage road to the Westpark Tollway off-ramp.
CobbFendley was responsible for the design and preparation of Plans, Specifications & Estimates (PS&E) for this on-system bridge replacement in Fort Bend County with an estimated $1.1 million construction cost.
CobbFendley provided engineering design services including a drainage impact analysis, master drainage plan, and construction plans serving the Royal Brook at Kingwood Subdivision, a proposed 342-acre single-family development located within the City of Houston.