Roy G. Guerrero Channel Stabilization and Bridge Restoration
CobbFendley provided surveying services to the City of Austin, establishing the overall project survey control and setting aerial targets for aerial LiDAR and orthoimages.
CobbFendley provided surveying services to the City of Austin, establishing the overall project survey control and setting aerial targets for aerial LiDAR and orthoimages.
CobbFendley was responsible for providing Utility Coordination and Subsurface Utility Engineering (SUE) services for all non-City owned utilities (dry utilities) for the City of Cedar Park.
CobbFendley is part of the Downtown Gateway Partner’s Team, providing Subsurface Utility Engineering (SUE), Surveying, Utility Coordination and Joint-Bid Utility Design Services for the proposed expansion of the existing CapMetro Downtown Platform Station.
CobbFendley was contracted by Pedernales Electric Cooperative to reconfigure the overhead electric distribution system at IH 35 and Posey Road due to a TxDOT roadway reconfiguration project.
CobbFendley performed design, bid, and construction phase services for 6,200 linear feet of 24-inch waterline along Weiss Lane, 2,600 linear feet of 12-inch waterline to access a new Pflugerville ISD High School, and 5,000 linear feet of 16-inch waterline relocation for Manville WSC.
The Texas Facilities Commission (TFC) is implementing Phase 1 of the Master Plans at both the Capitol Complex (CapCom) and the North Austin Complex (NAC). The TFC selected the CobbFendley team to provide professional engineering services as the Site Services Engineer (SSE) for the following projects.
CobbFendley reconstructed 4,000 linear feet of roadway from an existing 2-lane to a 3-lane cross-section, including a phase utilizing in-situ rehabilitation. Construction of this project provided a beginning phase of critical transportation infrastructure projects for the City of Pflugerville and was executed in coordination with several adjacent projects.