CobbFendley oversaw the utility coordination, design, agreements and ITS design to relocate and upsize a 20-inch sewer line to a 30-inch sewer line along US 89 from 500 West to 200 West in Provo, UT. CobbFendley replaced the sewer laterals from main line to the property line as well as designed the connection of the main line side streets at 400 West and 300 West. Our team provided SUE Quality Levels D  through A, new line design, franchise utility coordination, surveying, conflict assessment, Utah Transit Authority coordination, and Union Pacific Railroad coordination.