Bell Boulevard Realignment
CobbFendley was responsible for providing Utility Coordination and Subsurface Utility Engineering (SUE) services for all non-City owned utilities (dry utilities) for the City of Cedar Park.
CobbFendley was responsible for providing Utility Coordination and Subsurface Utility Engineering (SUE) services for all non-City owned utilities (dry utilities) for the City of Cedar Park.
CobbFendley is part of the Downtown Gateway Partner’s Team, providing Subsurface Utility Engineering (SUE), Surveying, Utility Coordination and Joint-Bid Utility Design Services for the proposed expansion of the existing CapMetro Downtown Platform Station.
CobbFendley served as the lead design engineer relocating aerial utilities from existing poles to new underground locations for this high profile streetscape project in Houston.
CobbFendley was contracted by Pedernales Electric Cooperative to reconfigure the overhead electric distribution system at IH 35 and Posey Road due to a TxDOT roadway reconfiguration project.
CobbFendley assisted Texas-New Mexico Power on the design of a new overhead feeder serving as a redundant circuit from the Cochise Substation 6.12 miles east to tie back into original distribution line in case of power outages and or fault current along main route.