FM 1516 Roadway Reconstruction
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles).
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles).
CobbFendley served as lead design engineer for this intersection improvements project providing roadway design, signing and pavement marking, traffic control, and bid and construction phase services.
CobbFendley assisted Texas-New Mexico Power on the design of a new overhead feeder serving as a redundant circuit from the Cochise Substation 6.12 miles east to tie back into original distribution line in case of power outages and or fault current along main route.
CobbFendley was selected by AT&T Communications to perform pole loading analysis and pole attachment application submission to CPS Energy for over 3,000 attachment points throughout the City of San Antonio and the surrounding area.
CobbFendley is designing 2.75 miles of wastewater interceptor along Woman Hollering Creek.
CobbFendley provided detailed channel, bridge, roadway design, bid and construction phase services for this Flood Control project for Bexar County.