CobbFendley’s Subsurface Utility Engineering (SUE) experts successfully met an aggressive design-build project schedule by using both Air Vacuum excavation trucks and Hydro Vacuum excavation trucks to dig 28 test holes in one day in a highly congested pipeline corridor. The space constraints of accessing the pipeline corridor were overcome by utilizing the green space and protective matting to strategically place the trucks to locate pipelines at various depths. Safety was CobbFendley’s utmost concern as experienced SUE crews swept the entire corridor to locate all pipelines and utilities to avoid future risk to the project.