Our Work
SH 199 at IH 820 Interchange
CobbFendley is providing preliminary engineering services for developing a design schematic of this multilevel interchange project. The project includes developing multiple alternative layouts in order to select a preferred alternative consisting of mainlanes, ramps, frontage roads, direct connectors, collector-distributor roads. The project also includes public involvement, value engineering study, data collection analysis, drainage, conceptual traffic control, traffic engineering/operations/simulations, 3-D modeling, and subsurface utility engineering. CobbFendley is leading and performing geometric design for interim and ultimate improvements, evaluating right-of-way needs, coordinating with team members and TxDOT, attending meetings, identifying and resolving design issues, preparing Design Criteria and Technical Memos, and performing quality assurance and quality control procedures.
How Can We Help?
Services that move you from concept to completion.