E. Pecan Street Widening

CobbFendley reconstructed 4,000 linear feet of roadway from an existing 2-lane to a 3-lane cross-section, including a phase utilizing in-situ rehabilitation. Construction of this project provided a beginning phase of critical transportation infrastructure projects for the City of Pflugerville and was executed in coordination with several adjacent projects.

Town and Country Boulevard Major Arterial Roadway Reconstruction

CobbFendley is providing roadway design, surveying, and subsurface utility engineering (SUE) services to reconstruct and add two eastbound lanes to Town and Country Boulevard, an existing concrete street, from Legacy Drive to Spring Creek Parkway, approximately 4,300 linear feet in length.