FM 361 at Fairchilds Creek On-system Bridge Replacement
CobbFendley was responsible for the design and preparation of Plans, Specifications & Estimates (PS&E) for this on-system bridge replacement in Fort Bend County with an estimated $1.1 million construction cost. Development of the PS&E included the design of the roadway geometry, guard fence, ditches, concrete and stone riprap, detour route, pavement markings, and construction estimates. CobbFendley provided oversight of the survey, drainage analysis, bridge design, and geotechnical investigation. Included coordination with TxDOT and Fort Bend County.