FM 1516 Roadway Reconstruction
CobbFendley provided design services required for the preparation of PS&E and related documents for the widening of FM 1516 from two lanes to four lanes of FM 1516 from SH 78 to FM 1976 (0.76 miles). The project included a new location roadway alignment, additional right-of-way, a two-way left-turn lane, storm sewer, sidewalks, bicycle lanes, driveways, traffic signals, and local street improvements. The congested corridor necessitated utility relocations, including rerouting approximately 4,400-linear feet of 12-inch transmission water main and approximately 1,900-linear feet of 8-inch wastewater line. CobbFendley was also responsible for assisting with the bid phase and construction phase for this project, including RFI response, meeting attendance, site visits, change order review, and related services.