Elevated 1.25M Gallon Water Tank
CobbFendley designed a new 1.25M-gallon elevated water tank for the City of Sachse.
DetailsCobbFendley designed a new 1.25M-gallon elevated water tank for the City of Sachse.
DetailsCobbFendley was responsible for design services and construction administration of the Main Street WWTP Improvements in Seabrook, Texas.
DetailsCobbFendley was responsible for the pipe bursting approximately 7,000 linear feet of 12” sanitary sewer gravity main along Todville Road from East Meyer Avenue to Brummerhop Street.
DetailsCobbFendley assisted the design engineer for this $14.1 million bridge reclamation and drainage project in New Mexico.
DetailsCobbFendley served as lead design engineer for this intersection improvements project providing roadway design, signing and pavement marking, traffic control, and bid and construction phase services.
DetailsCobbFendley provided Subsurface Utility Engineering (SUE) services for improvements the City of Round Rock’s Brushy Creek Wastewater Treatment Plant.
DetailsCobbFendley provided utility engineering and PS&E development to improve US 83 in Starr County from a 2-lane to a 4-lane divided highway.
DetailsCobbFendley is the lead design firm for the planning, surveying, design and construction of approximately 17,500 linear feet of 6-foot wide sidewalks in downtown New Braunfels.
DetailsCobbFendley has worked with the City of Grand Prairie for over eight years on drainage, erosion control, and bridge rehabilitation projects.
DetailsCobbFendley is currently under contract with the City of Fort Worth to develop access management concepts along University Drive from Chisholm Trail Parkway to Clear Fork Trinity River Bridge.
Details